CCC requirements approved February 2016, to be implemented October 1st 2016.
Same document with modifications shown.
CCC requirements plus Annex B - Revision 3.5 approved September 8, 2014
CCC Test Template - Published October 12, 2014
Axis
BGD
Dudek
Gin
Control .xls files
Boom 9 S - Boom 9 M - Boom 10 S - Boom 10 M - Boom 10 L - GTO2 X Alps XS
Kortel Design
Control .xls file
Nova
Control .xls files
Niviuk
Control .xls files
Ozone
Control .xls files
Enzo 2 XS - Enzo 2 S - Enzo 2 M - Enzo 2 L -
Skywalk
Control .xls files
Swing
CCC requirements plus Annex B - Revision 3.5 approved September 8, 2014
Detailed requirements in this document called "CIVL Competition Class (CCC) - Paragliders permitted in FAI Category 1 Cross Country events".
Annex B defines controls and procedures.
CCC Test Template - Published October 12, 2014
To be read in conjunction with the CCC requirement document and Annex B. In case of conflict between documents, specially concerning measurements and deadlines, the CCC-Test-Template document is the rule.
THIS AND THAT
All information concerning CCC requirements and process, including the list of CCC certified gliders, is now available here.
The CIVL Bureau, in agreement with the Paragliding Committee, has published a document (Excel format) called CCC-Test-Template-Oct2014. This document includes the following sheets:
Publication
Blank Measurement File Template
Measurement File Example
No comment.
Measurement Process example
This sheet describes how controls are done in competition. It will evolved asap in a kind of handbook, so everyone can measure and control following the same technic.
EN Gliders
All EN A, B and C gliders are accepted as they are.
All EN D gliders with flat aspect ratio of 7.0 or less are accepted as they are.
EN gliders EN certified in time for the 2014 European championship with flat aspect ratio higher than 7.0 (Axis Mercury Sport, Gin Boomerang 9, Niviuk Icepeak 7 Pro, Ozone Enzo 1 & 2, Swing Core 3…) have to comply with the following CCC requirements:
The Test-Lab-Template document is to be read in conjunction with the CCC requirement document V-3.5, including Annex B.
In case of conflict between documents, specially concerning measurements and deadlines, the CCC-Test-Template document is the rule.